What documentation is required for the DNO process in solar energy installations?
When installing solar energy systems, understanding the Distribution Network Operator (DNO) process is crucial. The DNO is responsible for maintaining the local electricity grid, and they must be informed of any new solar installations to ensure grid stability and safety. This process involves submitting specific documentation that provides detailed information about the planned installation.
To comply with DNO requirements, you need to gather and submit several key documents. These typically include a G99 or G98 application form, depending on the size of your installation. The application must detail the technical specifications of the solar system, including capacity, connection type, and grid export capabilities. Preparing these documents accurately is essential to gaining approval and connecting your solar installation to the grid.

Firstly, the G99 or G98 application forms are integral to the DNO process. These forms are used to assess the potential impact of your solar installation on the local electricity network. The G98 form is generally used for smaller installations, typically under 16 Amps per phase, while the G99 form is required for larger systems. Accurate completion of these forms is vital to prevent delays in the approval process.
In addition to these application forms, you will need to provide a detailed technical specification of your solar installation. This document should include information on the inverter type, capacity of the solar panels, and the proposed connection point to the grid. It is essential to ensure that all details are precise and match the system being installed, as discrepancies can lead to complications with the DNO.
Lastly, an export limitation scheme may be necessary if your installation intends to export surplus energy back to the grid. This scheme outlines how excess energy will be managed to prevent overloading the network. Including this documentation, when required, helps demonstrate compliance with grid regulations and supports the smooth integration of your solar installation into the existing infrastructure.